Hydro Power Plant Project – 0.635 MW

OPTIM PROJECT MANAGEMENT has performed a technical due diligence report on behalf of Intesa San Paolo Bank for a refurbished hydropower plant with a rated output of 0.635 MW located in Neagra Dornei village, Suceava County.

The review of project owned by Hydro Energy Land has been performed with the aim of identifying potential risk in the refurbishment, electrical connection, and yield energy path.

OPTIM PROJECT MANAGEMENT assessed the completion, reception and functionality of the Gura Haitii 2 hydro power plant and confirm its production.

OPTIM PM confirmed that no technological risk is present on this project in terms of the components used and quality of refurbishment.

 

September 2016