Portfolio

Photovoltaic Study – 1MW

Optim Project Management performed in Arges County a feasibility study regarding the integration of photovoltaic thin film panels into an existing building on its rooftop and façades.

The results of the study are positive, the irradiation average value and location of the building are suitable for the purposes of the project. No shadowing buildings are situated into the area of the project.  Optim PM made payback calculation, licensing process, yield energy calculation, and made also other technical recommendations.