Portfolio

Sun Plaza

Client: Sun Plaza
Service: Technical Due Diligence Audit MEP

Project Details: Optim PM were appointed to carry out a detailed technical Due Diligence Audit for the M&E Installations at SUN PLAZA Retail Mall, Bucharest. The existing multifunctional commercial retail center consists of approximately 60,000 m2 closed car parking on 2 levels, Anchor tenants, Cinema City, Baumax, Mobexpert, 45 to 60 Fashion outlets.
The Audit included the reviewing of the:
– Design, checking and testing of the installed equipment;
– Full HVAC systems, boilers, cooling towers and chilled water supply, roof tops, distribution;
– Drinking water supply and rainwater evacuation;
– Sewerage, tanks, pumps, car park separators;
– Fire detection and suppression systems and automatic smoke exhausts.