Portfolio

Photovoltaic Plant Project – 0.995 MW

Optim PM has performed a technical due diligence report on behalf of Intesa San Paolo Bank for a 0.995MW photovoltaic power plant, located in Insuratei – Braila County.

The photovoltaic power plant is operational and has been designed following a well-balanced structure typical for small sized ground based photovoltaic plant, and the estimated energy generation and production are all aligned.

Optim PM assessed the correct setting of the photovoltaic power plant project, the adequacy of the technical solutions adopted, and the compliance with the in-forced regulations.