Portfolio

Vertical Wind Turbines Integration into Buildings

Optim Project Management has performed a feasibility study regarding the integration of vertical wind turbines manufactured in Romania into existing building in Romania.

Wind speed measurements, power curve, payback calculation, foundation costs, yield energy and performance tests have been performed on site.

Optim PM concluded that, from wind speed point of view, the site location is suitable for the installation of vertical wind turbines, because in the area there are no tall buildings which can affect the wind speed measurements.