Tag Archives: CONSTRUCTION MANAGEMENT

Convention Center Timisoara

Client: Bega Group

Services: General Design, Permitting, Construction Management and Health & Safety Coordination

Project Details: Bega Group has appointed Optim Project Management as the General Designer and Construction Manager for the extension of Timisoara Hotel, an interesting new building that will bring the Convention Center concept to the city on the Bega River.

Classed as a multifunctional building, the Convention Center will have a height regime of 2 basements + GF + 1F + partial floor. The project is being built on a land area of 2,116 sqm and will have a total GBA of 8,350 sqm. There will be 70 parking places located in both basements and another 118 supporting parking places rented in an adjacent location; as green area, there will be 430 sqm allocated in total, out of which 347 sqm will be on the rooftop.

Optim PM was appointed in 2017 and started to provide full Design services, being responsible also for the Permitting process. The design successfully combines the exhibition area from the ground floor level with the multifunctional area from the first floor, which will be dedicated to conference events and festivities. On the rooftop, a food court will be fitted out and the terrace will be open to visitors.

The ground works of the Convention Center started in August 2018 and Optim PM is currently providing Construction Management and Health & Safety Coordination services. During the construction works, Austrian and Ottoman artefacts were discovered, thus Optim PM and the Client have worked in close collaboration with Vasile Parvan Institute of Archaeology Bucharest and the archaeological research was carried out in several stages in coordination with the construction works. All the proposed scientific objectives were successfully accomplished, and the construction area now has an Archaeological Discharge status.

The opening date of the Convention Center is targeted to take place in Q4 2019.

February 2019

Philip Morris – factory extension

Client: Philip Morris Romania

Services: General Design, Permitting, Construction Management, Cost Management, Site Inspection (Dirigentie de Santier), Health & Safety Coordination

Project details: Philip Morris Romania has recently appointed Optim PM as Construction Management and Design Services provider for transforming its Otopeni factory into one that produces exclusively HEETS™ for its heat-not-burn product IQOS™.
Construction works are scheduled in two phases between 2017 and 2019. The first phase comprises a new building, for which Optim PM will assure Construction Management, Cost Management, Site Inspection (Dirigentie de Santier) and Health & Safety coordination. For the second phase – during which an extension will be built – Optim PM will also provide, along the services mentioned before, Design & Permitting services.
Philip Morris has previously announced in a press release that it will invest up to 490 million EUR in the Otopeni factory. The investment will create about 300 additional jobs at the Romanian facility, over the following two years. Most of the production output will serve international markets.

 

August 2017

 

Aviatorilor 8

Client: NEPI

SERVICES: Construction Management, Cost Management, Site assessment, Health & Safety Coordination, BREEAM Assessment to Excellent

 

Optim PM has recently delivered the impressive project, Aviatorilor 8 for New Europe Property Investment. The office real estate development is located in the heart of Bucharest’s CBD, right near the Romanian Government and Piata Victoriei metro station. It comprises of an historic monument, Oromolu House, once property of the former National Bank Governor, Mihai Oromolu, that was completely restored and a new 3 floors contemporary office premises built in a L shape, surrounding the historical property.

Optim PM managed the construction works for the renovation of 785 sqm Oromolu House and of the new 15,845 sqm GBA office building, with a team of 9 professionals. The 3 floors basement will accommodate 204 parking places.

Currently, Optim Project Management is in the process of finalizing the BREEAM assessment for a targeted level of “Excellent”.

Photo Credit: arch. Vlad Patru

March 2017

Shopping City Galati – Optim PM appointed General Designer & Construction Manager for the Extension Project

Client: NEPI
Services: General Design Package, Permitting, Construction Management

Project details: Optim Project Management was chosen because of its experience in managing high quality and complex retail constructions. Shopping City Galati, located in the north part of city, involves the extension of the existing shopping centre, opened to the public in 2013, with an approximate GBA of 27,600 sqm.

The new expansion will provide a much-improved visitor experience and will include fashion shops, food court, services and entertainment areas and additional parking spaces. The project will accommodate as well, the first state of the art Cinema complex in Galati, offering to its clients 8 cinema halls.

The full scope of services includes General Design and Permitting, Cost & Construction Management, Health & Safety and Dirigentie de Santier services.

The construction is set to be completed by end 2017.

 

December 2016

 

The 10th Cinema City delivered by Optim PM

Client: Cinema City
Services: Architectural Design, Design Coordination between all Specialties, Technical Assistance for Architecture and MEP and Construction Management

Project details: Optim Project Management has recently added to its portfolio the 10th cinema made in Romania for Cinema City. The cinema complex located in ParkLake, Bucharest with an area of 4,078 sqm GLA, was built in 4 months and offers to its clients 14 halls and 1,951 seats, where 11 halls are equipped with 2D & 3D screens and 3 VIP halls.

Optim PM has provided the following services for the newest Cinema City in Bucharest: Architectural Design, Design Coordination between all Specialties, Technical Assistance for Architecture and MEP and Construction Management.

 

September 2016

Client: Bega Group

Services: General Design, Permitting, Construction Management and Health & Safety Coordination

Project Details: Bega Group has appointed Optim Project Management as the General Designer and Construction Manager for the extension of Timisoara Hotel, an interesting new building that will bring the Convention Center concept to the city on the Bega River.

Classed as a multifunctional building, the Convention Center will have a height regime of 2 basements + GF + 1F + partial floor. The project is being built on a land area of 2,116 sqm and will have a total GBA of 8,350 sqm. There will be 70 parking places located in both basements and another 118 supporting parking places rented in an adjacent location; as green area, there will be 430 sqm allocated in total, out of which 347 sqm will be on the rooftop.

Optim PM was appointed in 2017 and started to provide full Design services, being responsible also for the Permitting process. The design successfully combines the exhibition area from the ground floor level with the multifunctional area from the first floor, which will be dedicated to conference events and festivities. On the rooftop, a food court will be fitted out and the terrace will be open to visitors.

The ground works of the Convention Center started in August 2018 and Optim PM is currently providing Construction Management and Health & Safety Coordination services. During the construction works, Austrian and Ottoman artefacts were discovered, thus Optim PM and the Client have worked in close collaboration with Vasile Parvan Institute of Archaeology Bucharest and the archaeological research was carried out in several stages in coordination with the construction works. All the proposed scientific objectives were successfully accomplished, and the construction area now has an Archaeological Discharge status.

The opening date of the Convention Center is targeted to take place in Q4 2019.

February 2019