Philip Morris – factory extension

Client: Philip Morris Romania

Services: General Design, Permitting, Construction Management, Cost Management, Site Inspection (Dirigentie de Santier), Health & Safety Coordination

Project details: Philip Morris Romania has recently appointed Optim PM as Construction Management and Design Services provider for transforming its Otopeni factory into one that produces exclusively HEETS™ for its heat-not-burn product IQOS™.
Construction works are scheduled in two phases between 2017 and 2019. The first phase comprises a new building, for which Optim PM will assure Construction Management, Cost Management, Site Inspection (Dirigentie de Santier) and Health & Safety coordination. For the second phase – during which an extension will be built – Optim PM will also provide, along the services mentioned before, Design & Permitting services.
Philip Morris has previously announced in a press release that it will invest up to 490 million EUR in the Otopeni factory. The investment will create about 300 additional jobs at the Romanian facility, over the following two years. Most of the production output will serve international markets.

 

August 2017

 

Shopping City Galati – Optim PM appointed General Designer & Construction Manager for the Extension Project

Client: NEPI
Services: General Design Package, Permitting, Construction Management

Project details: Optim Project Management was chosen because of its experience in managing high quality and complex retail constructions. Shopping City Galati, located in the north part of city, involves the extension of the existing shopping centre, opened to the public in 2013, with an approximate GBA of 27,600 sqm.

The new expansion will provide a much-improved visitor experience and will include fashion shops, food court, services and entertainment areas and additional parking spaces. The project will accommodate as well, the first state of the art Cinema complex in Galati, offering to its clients 8 cinema halls.

The full scope of services includes General Design and Permitting, Cost & Construction Management, Health & Safety and Dirigentie de Santier services.

The construction is set to be completed by end 2017.

 

December 2016

 

Optim PM, General Designer for Arctic New Factory

Client: Arctic SA

Services: Full integrated design services (Architecture, Structure, MEP), Project Management for Tendering Phase, Permitting, LEED Certification.

Project details: Optim Project Management was appointed in 2016 by Arctic SA as the General Designer for Arctic new home appliance manufacturing facility in Romania.

The new factory will be located near Targoviste, Dambovita County and will have a GBA of 84,000 sqm on a plot of land of approx. 72 ha. The facility will consist in a production building (45,000 sqm), a warehouse (30,000 sqm), an office building (approx. 5,600 sqm), and will have a green area of 68,000 sqm and in total 490 parking places.

The full scope of services include General Design and Permitting, Project Management for tendering phase and consultancy for LEED certification.

The building permit was issued in April 2017 and construction is set to be completed by the end of 2017. Arctic SA wants to make out of this Arctic factory one of the biggest home appliances hub in South-East of Europe.

 

April 2017

 

Optim PM appointed General Designer for Yildiz MDF Factory in Romania

Client: Yildiz Entegre Romania
Services: Full integrated design services (Architecture, Structure, MEP), Permitting, Dirigentie de Santier Services, Health & Safety Monitoring

Project details: Optim Project Management was appointed in 2016 as General Designer for Yildiz Entegre’s new MDF Factory in Romania, located in Arges County.

Yildiz MDF Factory will be developed in phases and the 1st Phase of the project will have a GBA of about 99,000 sqm, and will consist of several buildings and technological structures, with different functions.

Besides being the General Designer, Optim PM is also providing Permitting, Health & Safety Monitoring, and Dirigentie de Santier Services.

The Building Permit was already obtained and the Phase 1 will be delivered end of 2017.

 

September 2016

 

Full design project and permitting undertook for ETI

On 25th of November 2014, OPTIM PM attended the ground breaking ceremony in Craiova with ETI, a Turkish biscuit manufacturer, together with municipality’s and ETI’s representatives and the Turkish Ambassador to Romania.  ETI European Food industries, have commenced in November a green field construction of their first factory outside of Turkey, on a plot of 7 hectares of land, with an investment of 40 mil euro.

The first phase of the development of some 20,000 m2 includes for raw material storage and production hall, utilities buildings and social and administrative buildings.

Optim Project Management undertook the full design and permitting for ETI’s new factory.

Optim received in April 2014 the first details regarding the concept and full design including DTAC, PT and DDE delivered by October, a total of 7 months, the Building Permit was issued on 6th of November 2014.

The design project for the biscuits factory has been a challenging task for our architecture and engineering team, due to the different specific technological requirements of the production process. Optim Project Management will now also supply Site Management services.

ETI have seven factories in Turkey, exporting in 40 countries and in Romania will produce savory and sweet biscuits and other cookies.

Client: Philip Morris Romania

Services: General Design, Permitting, Construction Management, Cost Management, Site Inspection (Dirigentie de Santier), Health & Safety Coordination

Project details: Philip Morris Romania has recently appointed Optim PM as Construction Management and Design Services provider for transforming its Otopeni factory into one that produces exclusively HEETS™ for its heat-not-burn product IQOS™.
Construction works are scheduled in two phases between 2017 and 2019. The first phase comprises a new building, for which Optim PM will assure Construction Management, Cost Management, Site Inspection (Dirigentie de Santier) and Health & Safety coordination. For the second phase – during which an extension will be built – Optim PM will also provide, along the services mentioned before, Design & Permitting services.
Philip Morris has previously announced in a press release that it will invest up to 490 million EUR in the Otopeni factory. The investment will create about 300 additional jobs at the Romanian facility, over the following two years. Most of the production output will serve international markets.

 

August 2017