Optim Project Management was appointed in 2016 by Arctic SA as the General Designer for this project, and its full scope of services included full integrated design services (Architecture, Structure, and MEP), Permitting and Project Management for tendering phase. Optim PM assisted Arctic SA during the entire construction period to comply with LEED rigor and currently, Arctic new facility is under certification procedures targeting the Platinum level.
The new investment is a Greenfield type and consists of a production building, storage area and offices, wastewater treatment plant, battery charging station, infiltration, and evaporation pond, concentrated solar panels and photovoltaic panels on the top of the building, retention tank, transformer station, etc. The factory is protecting the neighbourhood wildlife with specific environmental elements, such as a 30 meters wide tree line.