Renewable Energy

Renewable Energy

Portfolio Details

Biogas Station

CLIENT: Genesis Biopartner

SERVICE: TDD for the extension of an existing facility

LOCATION: Filipestii de Padure, Prahova

PERIOD: 2020

Hydro Power Plant Project – 0.635 MW

CLIENT: Hydro Energy Land

SERVICE: Final TDD on behalf of Intesa San Paolo Bank

LOCATION: Suceava

PERIOD: 2016

Hydro Power Plant Project – 1.260 MW

CLIENT: Hydro Energy Land

SERVICE: Final TDD on behalf of Intesa San Paolo Bank

LOCATION: Suceava

PERIOD: 2016

Photovoltaic monitoring study – 3.984 MW

CLIENT: Imam Sole e Vento

SERVICE: Production Monitoring TDD report on behalf of Intesa San Paolo Bank

LOCATION: Calarasi

PERIOD: 2016

Vertical Wind Turbines Integration into Buildings

CLIENT: NA

SERVICE: Feasibility study regarding the integration of vertical wind turbines

LOCATION: Bucharest

PERIOD: 2016

Photovoltaic Plant Project – 0.95 MW

CLIENT: Grenerg

SERVICE: Final TDD on behalf of Intesa San Paolo Bank

LOCATION: Satu Mare

PERIOD: 2016

Wind Farm Project – 1.5 MW

CLIENT: Grenerg

SERVICE: Final TDD on behalf of Intesa San Paolo Bank

LOCATION: Galati

PERIOD: 2016

Wind Farm Project – 1.5 MW

CLIENT: Grenerg

SERVICE: Final TDD on behalf of Intesa San Paolo Bank

LOCATION: Galati

PERIOD: 2016

Wind Farm Project – 1 MW

CLIENT: Grenerg

SERVICE: Final TDD on behalf of Intesa San Paolo Bank

LOCATION: Galati

PERIOD: 2016

Photovoltaic Plant Project – 0.995 MW

CLIENT: Energofotoinstal

SERVICE: Final TDD on behalf of Intesa San Paolo Bank

LOCATION: Braila

PERIOD: 2016

Photovoltaic Study

CLIENT: NA

SERVICE: Feasibility Study photovoltaic rooftop

LOCATION: Arges

PERIOD: 2016

Photovoltaic Rooftop + Façade – 0.5 MW

CLIENT: NA

SERVICE: Feasibility Study and Cost Study

LOCATION: Bucharest

PERIOD: 2016

Photovoltaic Plant Project – 8.749 MW

CLIENT: Ra Ra Park

SERVICE: Final TDD on behalf of Millennium Bank

LOCATION: Tulcea

PERIOD: 2015

Wind Plant Project – 11.5 MW

CLIENT: Energo Proiect

SERVICE: TDD reports during project development

LOCATION: Curcubata

PERIOD: 2015

Hydro Power Plant Project – 1.073 MW

CLIENT: Finite Group

SERVICE: Buyer TDD

LOCATION: Baia Mare

PERIOD: 2015

Hydro Power Plant – 1.7 MW

CLIENT: Hidro Este

SERVICE: Final TDD on behalf of OTP Bank

LOCATION: Satului

PERIOD: 2015

Wind Plant Project – 13.75 MW

CLIENT: Energobit / Enex

SERVICE: TDD reports during project development

LOCATION: Tulcea

PERIOD: 2012-2014

Photovoltaic Carport – 0.65 MW

CLIENT: Retail Park

SERVICE: Feasibility Study for photovoltaic panels and electrical charges for 50 parking places designated for electrical vehicles

LOCATION: Bucharest

PERIOD: 2014

Hydro Power Plant – 1.657 MW

CLIENT: Transeastern Energy / Rott Energy

SERVICE: Final TDD on behalf of OTP Bank

LOCATION: Cugir, Alba

PERIOD: 2014

Hydro Power Plant Project – 1.364 MW

CLIENT: BCR Bank

SERVICE: TDD reports during project development

LOCATION: Zagra

PERIOD: 2012

Biogas Project – 2 MW

CLIENT: Genesis Biopartner

SERVICE: Buyer TDD

LOCATION: Codlea

CAPACITY: 2 MW

PERIOD: 2012