Portfolio Details
Biogas Station
CLIENT: Genesis Biopartner
SERVICE: TDD for the extension of an existing facility
LOCATION: Filipestii de Padure, Prahova
PERIOD: 2020
Hydro Power Plant Project – 0.635 MW
CLIENT: Hydro Energy Land
SERVICE: Final TDD on behalf of Intesa San Paolo Bank
LOCATION: Suceava
PERIOD: 2016
Hydro Power Plant Project – 1.260 MW
CLIENT: Hydro Energy Land
SERVICE: Final TDD on behalf of Intesa San Paolo Bank
LOCATION: Suceava
PERIOD: 2016
Photovoltaic monitoring study – 3.984 MW
CLIENT: Imam Sole e Vento
SERVICE: Production Monitoring TDD report on behalf of Intesa San Paolo Bank
LOCATION: Calarasi
PERIOD: 2016
Vertical Wind Turbines Integration into Buildings
CLIENT: NA
SERVICE: Feasibility study regarding the integration of vertical wind turbines
LOCATION: Bucharest
PERIOD: 2016
Photovoltaic Plant Project – 0.95 MW
CLIENT: Grenerg
SERVICE: Final TDD on behalf of Intesa San Paolo Bank
LOCATION: Satu Mare
PERIOD: 2016
Wind Farm Project – 1.5 MW
CLIENT: Grenerg
SERVICE: Final TDD on behalf of Intesa San Paolo Bank
LOCATION: Galati
PERIOD: 2016
Wind Farm Project – 1.5 MW
CLIENT: Grenerg
SERVICE: Final TDD on behalf of Intesa San Paolo Bank
LOCATION: Galati
PERIOD: 2016
Wind Farm Project – 1 MW
CLIENT: Grenerg
SERVICE: Final TDD on behalf of Intesa San Paolo Bank
LOCATION: Galati
PERIOD: 2016
Photovoltaic Plant Project – 0.995 MW
CLIENT: Energofotoinstal
SERVICE: Final TDD on behalf of Intesa San Paolo Bank
LOCATION: Braila
PERIOD: 2016
Photovoltaic Study
CLIENT: NA
SERVICE: Feasibility Study photovoltaic rooftop
LOCATION: Arges
PERIOD: 2016
Photovoltaic Rooftop + Façade – 0.5 MW
CLIENT: NA
SERVICE: Feasibility Study and Cost Study
LOCATION: Bucharest
PERIOD: 2016
Photovoltaic Plant Project – 8.749 MW
CLIENT: Ra Ra Park
SERVICE: Final TDD on behalf of Millennium Bank
LOCATION: Tulcea
PERIOD: 2015
Wind Plant Project – 11.5 MW
CLIENT: Energo Proiect
SERVICE: TDD reports during project development
LOCATION: Curcubata
PERIOD: 2015
Hydro Power Plant Project – 1.073 MW
CLIENT: Finite Group
SERVICE: Buyer TDD
LOCATION: Baia Mare
PERIOD: 2015
Hydro Power Plant – 1.7 MW
CLIENT: Hidro Este
SERVICE: Final TDD on behalf of OTP Bank
LOCATION: Satului
PERIOD: 2015
Wind Plant Project – 13.75 MW
CLIENT: Energobit / Enex
SERVICE: TDD reports during project development
LOCATION: Tulcea
PERIOD: 2012-2014
Photovoltaic Carport – 0.65 MW
CLIENT: Retail Park
SERVICE: Feasibility Study for photovoltaic panels and electrical charges for 50 parking places designated for electrical vehicles
LOCATION: Bucharest
PERIOD: 2014
Hydro Power Plant – 1.657 MW
CLIENT: Transeastern Energy / Rott Energy
SERVICE: Final TDD on behalf of OTP Bank
LOCATION: Cugir, Alba
PERIOD: 2014
Hydro Power Plant Project – 1.364 MW
CLIENT: BCR Bank
SERVICE: TDD reports during project development
LOCATION: Zagra
PERIOD: 2012
Biogas Project – 2 MW
CLIENT: Genesis Biopartner
SERVICE: Buyer TDD
LOCATION: Codlea
CAPACITY: 2 MW
PERIOD: 2012